job hours startdate finishdate   job hours startdate finishdate
1 framing 1f       16 inside trim 1f      
2 framing 2f       17 inside trim 2f      
3 framing ext       18 outside trim      
4 elec ruff 1f       19 doors 1f      
5 elec ruff 2f       20 doors 2f      
6 plumb ruff       21 decks      
7 plumb trim       22 siding touch up      
8 insulation 1f       23 paint outside      
9 insulation 2f       24 paint inside 1f      
10 sheetrock 1f       25 paint inside 2f      
11 tape 1f       26 hvac 1st fl      
12 mud 1f       27 hvac 2nd fl      
13 sheetrock 2f       28 floors wd/tile 1f      
14 tape 2f       29 floors wd/tile 2f      
15 mud 2f         total hours      
                 
item units cost total   item units cost total